From raw biogas to bio-CNG
CleanCycle does not build new biogas plants; it upgrades the raw biogas of existing plants into biomethane and bio-CNG.
Today, the gas is turned into electricity in the CHP unit (combined heat and power unit). After support under Germany’s Renewable Energy Sources Act (EEG) ends, the electricity price of a standard 500 kW plant falls by 25%; the operating result (EBITDA) of this standard plant falls significantly.
Source: Electricity price after EEG support ends: Bundesnetzagentur (Federal Network Agency), average award values of the biomass tenders from October 2025 to October 2026 · Electricity price under the EEG and EBITDA: CleanCycle example 2026
CleanCycle’s chain has four stages:
- Secure raw biogas: from your existing plant, optimised with FaserMAX and the CleanCycle Cube.
- Upgrade to biomethane: membrane upgrading to at least 97% methane.
- Compress and deliver: to 250–300 bar, by trailer to the hub – or into the grid where a grid injection point is nearby.
- Sell: bio-CNG as HGV fuel, together with the greenhouse gas reduction quota (GHG quota).
The product is primarily bio-CNG as HGV fuel. Bio-LNG is in preparation.
With or without a gas grid
Whether the biomethane goes into the gas grid or is transported by trailer depends on whether there is a grid injection point near the biogas plant.
If there is no gas grid nearby, there is the virtual pipeline: the biomethane is upgraded on site, compressed to 250–300 bar and taken by trailer to the hub or directly to the customer. Several plants in a region use a shared hub. Nothing changes on your farm.
If biomethane is to be injected into the gas grid, the plant needs a grid connection. You, as the plant operator, are the connecting party: you pay the advance payment for the connection assessment and your share of the grid connection costs. We clarify details such as the advance payment, pipeline length and process for your plant in a conversation with you.
Four modules, one chain
Converting a plant with CleanCycle involves four modules: biogas optimisation with FaserMAX, biomethane and bio-CNG, GHG quotas, and CO₂ and algae.
- Biogas optimisation · FaserMAX: mechanical substrate pre-treatment – grass, manure and maize fibres are broken down. This produces more raw biogas from the same substrate. FaserMAX: around 20% more gas, verified in a batch test with your own substrates. Second lever: the CleanCycle Cube – CleanCycle’s own measurement and control technology, which controls the biology in the digester.
- Biomethane and bio-CNG: membrane upgrading to at least 97% methane, compression to 250–300 bar, supply via the virtual pipeline.
- GHG quotas: certification and trading of the GHG quota.
- CO₂ and algae: the separated CO₂ serves as a carbon source in photobioreactors – microalgae, including spirulina, for feed and biostimulants.
The GHG quota obliges companies that place fuels on the market to reduce the greenhouse gas emissions of their fuels by a percentage set by law (Section 37a BImSchG, Federal Immission Control Act). The quota in transport rises from 12.0% (2026) to 17.5% (2027), 26.5% (2030) and 41.0% (2035).
Source: Section 37a(4) BImSchG
Bio-CNG saves greenhouse gases compared with fossil fuel – how much depends on substrate and process: for biomethane from slurry, RED II gives typical savings of more than 100%, which means a negative greenhouse gas balance in the calculation; for maize and biowaste the values are lower.
Source: Directive (EU) 2018/2001 (RED II), Annex VI, Part A, biomethane for transport
Who finances what
CleanCycle finances the technology for the conversion – whether you sell your raw biogas, lease your plant or sell it.
CleanCycle finances FaserMAX, upgrading and filling. If you feed into the gas grid, you bear the costs of the grid connection: the advance payment to the grid operator and your share of the connection costs. We will discuss the size of your share for your plant with you.
CleanCycle is not a plant manufacturer: CleanCycle develops the project, finances the technology, builds and operates the optimisation itself and sells the gas together with the GHG quota. CleanCycle also provides and finances the CleanCycle Cube. CleanCycle carries the risk of the technology and only earns once your gas flows.
Your role afterwards depends on the option: if you sell your raw biogas, you continue to operate your plant and sell the raw biogas to CleanCycle. If you lease your plant, CleanCycle takes over operation and conversion, and you receive a fixed lease payment. If you sell your plant, you receive a purchase price.
Five steps – for plants from 250 kW
Converting a plant with CleanCycle takes five steps: plant questionnaire, initial assessment, site visit and batch test, concept and offer, contract and conversion.
- Plant questionnaire: you complete the plant questionnaire. Simply leave blank any fields you are unsure about.
- Initial assessment: we tell you which option fits.
- Site visit and batch test: we visit your plant and measure the gas yield of your own substrates in the laboratory.
- Concept and offer: with the concept and offer, we record the chosen option in a letter of intent.
- Contract and conversion: grid connection, implementation and commissioning.
Every figure in the concept can be traced back to your plant’s substrate and process data. You can download the plant questionnaire (in German, PDF or Word) on the Post-EEG Check page – or request the Check first, and we will go through it together.
Five questions show whether your plant is a fit. CleanCycle works with plants from 250 kW; smaller plants are bundled with neighbouring plants.
- Does your EEG support end by 2032?
- Does your plant have 250 kW or more?
- Is there a gas pipeline nearby? If not, the gas is transported by trailer.
- Do you use slurry or manure? This significantly improves the greenhouse gas value (GHG value) of your gas.
- Do you want to continue operating, lease or sell?
Source on the GHG value of slurry and manure: Directive (EU) 2018/2001 (RED II), Annex VI, Part A, biomethane for transport
The starting point is the Post-EEG Check, which is free and without obligation: five questions in four short steps – then CleanCycle will get back to you within 2 working days. You do not have to decide yet: in the Post-EEG Check, you can leave the question of the option open.