Skip to content
Illustrative image: operator with a tablet in front of a digester
Illustrative image, AI-generated – not a specific plant.

Is your plant a fit?

Free Post-EEG Check

Free and without obligation: five questions in four short steps – then CleanCycle will get back to you within 2 working days.

  1. 01Your plant
  2. 02Gas & substrate
  3. 03Your option
  4. 04Contact
Step 1 of 4Your plant

A particularly good fit if EEG support ends by 2032.

kW

Ideally 250 kW or more. Smaller plants are bundled with neighbouring plants.

Step 2 of 4Gas & substrate
Is there a gas pipeline nearby? required

Without a gas pipeline, the gas is transported by trailer – the virtual pipeline.

Do you use slurry or manure? required

Slurry or manure significantly improves the greenhouse gas value (GHG value) of your gas.

Step 3 of 4How would you like to proceed?
Step 4 of 4Where is the plant located, and how can we reach you?

Optional – so that we can send you documents.

When you submit this form, we process your details in order to handle your request. More in the privacy policy.

Plant questionnaire

Download the plant questionnaire (PDF/Word, in German), fill it in and send it to info@clean-cycle.eu – or request the Check first, and we will go through it together.

Grid connection deadline

Plant questionnaire to CleanCycle by 30 November 2026

12 days left
  1. By 30 November 2026Plant questionnaire to CleanCycleSimply leave blank any fields you are unsure about.
    Download the plant questionnaire (in German): PDF(184 kB)Word(185 kB)
  2. By 31 December 2026Your advance payment must have reached the grid operatorYou pay the advance payment for the connection assessment to the grid operator; it must have been received by then.
  3. ThenThe grid operator bears 75%of the grid connection costs. Your share as the connecting party: at most €250,000 for up to 1 km of pipeline.

The grid connection request does not oblige you to build. Section 118(4) EnWG (Energy Industry Act) in conjunction with Section 33(1) to (9) GasNZV (Gas Network Access Ordinance, version in force until 31 December 2025)

What happens next

Five steps to the contract

After your request, we will get back to you within 2 working days.
  1. Plant questionnaire

    You complete the plant questionnaire. Simply leave blank any fields you are unsure about.

    Download the plant questionnaire (in German): PDF(184 kB)Word(185 kB)
  2. Initial assessment

    We tell you which option fits.

  3. Site visit and batch test

    We visit your plant and measure the gas yield of your own substrates in the laboratory.

  4. Concept and offer

    With the concept and offer, we record the chosen option in a letter of intent. Every figure in the concept can be traced back to your plant’s substrate and process data.

  5. Contract and conversion

    Grid connection, implementation and commissioning.